« »

Stripped, Cleaned and Relaid

September 20, 2013

Mat wanted to get a little more work done at the cabin so, when we had an opportunity to reroof the shed, Mat jumped on it. We had metal roof panels prefabbed in town which we hauled up in the boat. The old duroid was stripped, the base layer prepped and then the new metal was put down. Now all cabins have similar roofs with the main thing being that since the shed now houses the solar system it is a critical link in the program and should now last for quite a while.